Move gas pipe from under school?

Original post made on Nov 9, 2011

Officials with the Mountain View Whisman School District would like to see PG&E remove both gas lines running beneath Crittenden Middle School's soccer field, but for the time being, it appears that they will have to settle for just one.

Read the full story here Web Link posted Wednesday, November 9, 2011, 1:48 PM

Comments (3)

Posted by Mike H., a resident of Blossom Valley
on Nov 9, 2011 at 7:05 pm

I wish how far these pipelines are from school buildings was stated. Gas pipelines as big as these can cause severe burns on anyone nearby if the gas ignites when they fail.

This is more than a Mountain View issue, for I know of a school in the East Bay with a petroleum products pipeline running under the sidewalk in front of that school.


Posted by Gaz, a resident of Cuernavaca
on Nov 10, 2011 at 2:54 pm

What was there first, the pipeline or the school? Also, the pipeline in question just passed a test that held it for 8 hours at 1.5X the maximum allowable pressure. If the pipe was damaged or failed the test, I could see replacing it, but as it was just proven safe, it would be a waste of rate payer's money to replace it because people are uncomfortable with the idea of the pipe...yes, even though it was proven safe just a few months ago.


Posted by Steven Nelson, a resident of Cuesta Park
on Nov 10, 2011 at 5:14 pm

Here is what I picked up at the Board of Ed. meeting, (generally, good work from Sup. Goldman and staff) There are two pipelines that go under the soccer and baseball fields (not near buildings). The older one was recently pressure tested (150% as noted), and the one to be replaced is slightly newer - but needs to be enlarged. PG&E would like to build the new pipe in a replacement trench along the street - and under a parking lot (Middlefield side). PG&E owns the two easements with the two lines under the fields - that were installed before the school was built. The TV news cast was a bit sensational (IMO), the old and newer lines are not in any current danger of failure. The PG&E plan and expected school acceptance was disclosed to neighbors - none showed up at meeting.
I do not consider this to be any major issue - both pros and cons exist. Both lines cannot be out of service at once! It is highly desired to do work summer of 2012.
The old pipe section would be filled with cement (in-place) and not dug up.


If you were a member and logged in you could track comments from this story.

Post a comment

Posting an item on Town Square is simple and requires no registration. Just complete this form and hit "submit" and your topic will appear online. Please be respectful and truthful in your postings so Town Square will continue to be a thoughtful gathering place for sharing community information and opinion. All postings are subject to our TERMS OF USE, and may be deleted if deemed inappropriate by our staff.

We prefer that you use your real name, but you may use any "member" name you wish.

Name: *

Select your neighborhood or school community: * Not sure?

Comment: *

Verification code: *
Enter the verification code exactly as shown, using capital and lowercase letters, in the multi-colored box.

*Required Fields

Handmade truffle shop now open in downtown Palo Alto
By Elena Kadvany | 3 comments | 2,541 views

Breastfeeding Tips
By Jessica T | 6 comments | 1,086 views

Who Says Kids Donít Eat Vegetables?
By Laura Stec | 5 comments | 912 views

Community Service Helps You, Too
By John Raftrey and Lori McCormick | 1 comment | 716 views

Not Witty or Fun
By Chandrama Anderson | 0 comments | 637 views